Message-ID: <19335772.1075846727049.JavaMail.evans@thyme> Date: Mon, 24 Jul 2000 07:13:00 -0700 (PDT) From: susan.scott@enron.com To: tony.pryor@enron.com Subject: TW questions Mime-Version: 1.0 Content-Type: text/plain; charset=ANSI_X3.4-1968 Content-Transfer-Encoding: quoted-printable X-From: Susan Scott X-To: Drew Fossum@ENRON, Tony Pryor X-cc: X-bcc: X-Folder: \Susan_Scott_Dec2000_June2001_1\Notes Folders\Sent X-Origin: SCOTT-S X-FileName: sscott3.nsf After our IOS adventure last week, I put together the following questions= =20 that need to be resolved. Some of them have needed to be resolved for quit= e=20 some time. Tony, let's talk since I think some of these have already been= =20 discussed and maybe resolved in the context of developing TW's EnronOnline= =20 site, and I just need to get up to speed. To the extent there aren't answe= rs=20 yet, I'll get busy researching. Drew -- comments? Shall we all get on the= =20 phone & discuss this? List of TW contracting issues 1. Reevaluate the following in the context of current FERC negotiated rate= =20 policy: a. Transwestern's current form discount letter states: "[t]he total char= ge=20 shall include all applicable surcharges." Should this language be revised= ,=20 and if so, how? b. Transwestern usually charges one-part rates, and includes language in= =20 its discount letter stating that Transwestern shall allocate the combined= =20 rate between the reservation and commodity components inclusive of=20 surcharges. Are one-part rates really negotiated rates? material deviatio= ns=20 from the tariff?=20 c. Transwestern's discount letter includes a statement that in no event= =20 shall the contract rate be greater than the maximum or lower than the minim= um=20 rates provided in Transwestern=01,s tariff. This was intended as assurance= that=20 the contract is not a negotiated rate. Is this language still effective? = =20 necessary? 2. IOS/EnronOnline: a. When should IOS be conducted, if at all? b. Once notice of IOS or EnronOnline bidding has been posted, can the=20 subject capacity still be sold off-line (i.e., pursuant to traditional=20 bidding procedures)? c. Is our system for IOS and EnronOnline set up to handle max rate biddin= g=20 situations in a nondiscriminatory manner and in compliance with the bid=20 evaluation procedures in the tariff? If not, what changes need to be made?