Message-ID: <15604414.1075841547258.JavaMail.evans@thyme> Date: Fri, 25 Jan 2002 19:33:49 -0800 (PST) From: angie.nicastro@nerc.net To: angie@nerc.com Subject: Standards Announcement -- Phase IIB, IIA (2 Standards), and Definitions of Terms Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Angie Nicastro X-To: angie@nerc.com X-cc: X-bcc: X-Folder: \ExMerge - Semperger, Cara\Deleted Items X-Origin: SEMPERGER-C X-FileName: cara semperger 6-26-02.PST TO: STANDARDS LIST SERVER GROUP NERC ROSTER Ladies and Gentlemen: PHASE IIB AND IIA (2 STANDARDS) STANDARDS, AND DEFINITIONS OF TERMS On February 20, 2002, the NERC Board of Trustees will consider the following Planning Standards and definitions of terms as used in the Planning Standards for approval. This posting is the 30-day (actually 26-day) notification prior to the Board's vote. A. Phase IIB Planning Standards (TTC and ATC) The Phase IIB Standards (TTC and ATC) were approved by the Market Interface Committee at its January 10-11, 2002 meeting and by the Planning Committee by mail ballot on January 23, 2002. They include one Standard and three measurements and compliance templates as follows: I.E.1 S1, M1, M3-M4 - Transfer Capabilities (TTC and ATC). They can be viewed or downloaded from the NERC web site. http://www.nerc.com/~pc/standards/#PhIIB_TTCATC B. Phase IIB Planning Standards (CBM and TRM) The Phase IIB Standards (CBM and TRM) were approved by the Market Interface Committee at its January 10-11, 2002 meeting and by the Planning Committee by mail ballot on January 23, 2002. They include two Standards and six measurements and compliance templates as follows: I.E.2 S1-S2, M1, M3-M6, M8 - Transfer Capabilities (CBM and TRM). They can be viewed or downloaded from the NERC web site: http://www.nerc.com/~pc/standards/#PhIIB_CBMTRM C. Phase IIA Planning Standards (Two reconsidered Standards) The Planning Committee approved the Phase IIA (two reconsidered) Standards at its November 19-20, 2001 meeting. The Market Interface Committee also approved these Standards at its January 10-11, 2002 meeting. These Phase IIA Planning Standards include two Standards and three associated measurements and compliance templates: I.A. S3, M3 - Transmission Systems III.A. S3, M3 and M5 - Transmission Protection Systems These Standards can be viewed or downloaded from the NERC web site: http://www.nerc.com/~pc/standards/#PhIIA_IAIIIA D. Definitions of Terms as Used in the Planning Standards The Market Interface Committee approved 17 definitions of terms used in the Planning Standards at its January 10-11, 2002 meeting. It also chose to remove five proposed definitions that it believed to be unclear, circular, or inconsistent with terms in other glossaries. These five terms are: 1. Entities Responsible for the Reliability of the Interconnected Transmission System 2. Local Network 3. Regional Process 4. Radial Customer 5. User of the Interconnected Electric Systems The Planning Committee approved the complete list of terms and their definitions by mail ballot on January 23, 2002. These definitions and terms as used in the Planning Standards can be viewed and downloaded from the NERC web site: http://www.nerc.com/~pc/standards/#definitions Next Steps If approved by the NERC Board, these Planning Standards will be the last groupings of Planning Standards that will have completed the 1997 NERC Standards Development Process, including field testing, and a re-review through the 1997 NERC Standards Development Process. Following Board approval, these Planning Standards will be available for formal implementation of reviews for compliance under the NERC Compliance Program. No further Planning Standards will be developed and approved under NERC's 1997 Standards process. The Standards, if approved by the Board, will remain in effect until they are replaced by NERC Organization Standards. Sincerely, Angie Nicastro Secretary-Engineering