Message-ID: <12010537.1075858506624.JavaMail.evans@thyme> Date: Fri, 25 May 2001 13:50:29 -0700 (PDT) From: kourtney.nelson@enron.com To: chris.stokley@enron.com Subject: FW: Enron questions Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Nelson, Kourtney X-To: Stokley, Chris X-cc: X-bcc: X-Folder: \Stokley, Chris (Non-Privileged)\Chris Stokley\Volume Mang. X-Origin: Stokley-C X-FileName: Stokley, Chris (Non-Privileged).pst -----Original Message----- From: "Almeida, Keoni" @ENRON [mailto:IMCEANOTES-+22Almeida+2C+20Keoni+22+20+3CKAlmeida+40caiso+2Ecom+3E+40ENRON@ENRON.com] Sent: Thursday, May 24, 2001 3:13 PM To: Foster, Chris H.; Nelson, Kourtney Subject: Enron questions Our folks are continuing to review all the questions. However, below is a section that been has responded to: > 3. On any Day, if the Must Offer Generator cannot generate the full > PMax it must file a generation outage report, in the form of Attachment 2, > to the CAISO. Otherwise the full PMax is deemed to be available for > dispatch by the ISO. > > Q - Is there any tolerance here given by the ISO? For example, if a PMax > is 30 MW and a Must Offer Generator can only do 29 MW due to ambient > temperature conditions, must that Must Offer Generator submit an outage > report for 1 MW? > A - Yes, see next answer for detail. > Q - Can such minor deviations be called in to the Generation outage desk > rather than a report being filed? > A - At this point there is no tolerance factor. An Outage Report must be > created for any change of state (i.e., any factor impacting the maximum > capability of the unit) whether from a de-rate (e.g., ambient temperature) > or an equipment outage. If the de-rate is known in advance (e.g., low > water), it may be submitted to the Outage Coordination Office. If the > de-rate surfaces only in the real-time, it must be reported to the > Generation Dispatcher who will create an Outage ticket. At this time, it > should handled as an outage, indicating that the unit is de-rated and for > what cause and expected duration. > >