Message-ID: <30096383.1075857804001.JavaMail.evans@thyme> Date: Fri, 20 Oct 2000 04:07:00 -0700 (PDT) From: judy.townsend@enron.com To: james.mckay@enron.com Subject: HPL Meter Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: Judy Townsend X-To: James McKay X-cc: X-bcc: X-Folder: \Judith_Townsend_Jun2001\Notes Folders\Discussion threads X-Origin: Townsend-J X-FileName: jtownse.nsf ---------------------- Forwarded by Judy Townsend/HOU/ECT on 10/20/2000 11:01 AM --------------------------- lamoss@duke-energy.com on 10/18/2000 02:05:54 PM To: judy.townsend@enron.com cc: Subject: HPL Meter Here is the message I received from my technical folks. (below in red). As you can see a lot of work is involved. Let me know how much you would plan to nominate at this point, etc. And can they committ to a certain, volume, etc. Also, have they talked to HPL about taking gas at this point. After visiting the site (M&R 71886/76886), I found the following work that would need to be done before custody transfer measurement could be performed : (The site has two 12" meter runs with valve switching (bidirectional flow) and run switching - and has not flow gas in over 10 years) 1. All valves will need to be inspected & overhauled A. Run switching valve - major overhaul (needs to be sent off for this work) B. Control valves - inspected & overhauled (needs to be sent off for this work) C. Small regulators overhauled 2. Both meter tubes pulled and inspected A. Sr. fitting needs to be overhauled B. Tubes will need to be honed (needs to be sent off to have fitting overhauled and tubes honed) 3. All transmitter need to be replaced A. Differential - 2 B. Temperature - 2 (1 additional from original setup) C. Pressure - 4 D. Direct mount manifolds - 2 E. UPS system 4. RTU boards need to be furnished A. Mother board B. STI REM C. Main terminal board D. Serial IO LEM E. Analog Output board 5. New batteries ( 4 @ $ 160) 6. Two sets of orifice plates (In .50" increments through Beta range) It would take at least 1.5 months to re-work the station controls and associated valves, meter runs, and EGM. If you need more information please let me know.