Message-ID: <1090047.1075860909068.JavaMail.evans@thyme>
Date: Thu, 13 Dec 2001 08:51:40 -0800 (PST)
From: rich.jolly@enron.com
To: david.roensch@enron.com, darrell.schoolcraft@enron.com
Subject: RE: Griffith Interconnect Pressure
Cc: kimberly.watson@enron.com
Mime-Version: 1.0
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: quoted-printable
Bcc: kimberly.watson@enron.com
X-From: Jolly, Rich </O=ENRON/OU=NA/CN=RECIPIENTS/CN=RJOLLY>
X-To: Roensch, David </O=ENRON/OU=NA/CN=RECIPIENTS/CN=Notesaddr/cn=68f10420-593507c0-86256744-5ee2d3>, Schoolcraft, Darrell </O=ENRON/OU=NA/CN=RECIPIENTS/CN=Dschool>
X-cc: Watson, Kimberly </O=ENRON/OU=NA/CN=RECIPIENTS/CN=Kwatson>
X-bcc: 
X-Folder: \Kim_Watson_Mar2002\Watson, Kimberly\E-mail Bin
X-Origin: Watson-K
X-FileName: kwatson (Non-Privileged).pst

Thanks Tiny. Kim and Darrell let us know how you want to do this and we'll =
move forward. If we can get some kind of agreement put together with Citize=
ns on what they need maybe we can do these changes one time. As you know we=
 have had a lot of issues with them since start up.=20
Thanks
RJ
 -----Original Message-----
From: =09Roensch, David =20
Sent:=09Thursday, December 13, 2001 7:52 AM
To:=09Schoolcraft, Darrell
Cc:=09Jolly, Rich; Watson, Kimberly
Subject:=09Griffith Interconnect Pressure

I'm going to try and clear this up:

Robert Francen (928-226-2219) with Citizens called about the Griffith inter=
connect a couple of weeks ago.  He made a request that we configure our flo=
w control valve with a pressure control over-ride and reduce the supply pre=
ssure to the Citizens station supplying the Griffith power plant.  Although=
 I know the RTU has this capability, I told Robert that I would have to che=
ck with our Tech folks to see if we had this capability.  My concern was th=
at by lowering our supply pressure to Citizens it would make it easier to s=
witch or split flows to the power plant with El Paso.  El Paso's supply pre=
ssure runs a couple of hundred pounds lower than TW's in this area and they=
 cannot get in to Citizens with incurring huge swings at Citizens and shutt=
ing TW in currently.  So, simply stated, I did not want to proceed without =
direction from Marketing or Gas Control.  If I remember correctly when I ca=
lled and discussed this issue with you a couple of weeks ago, we were in ag=
reement not do reduce the pressure supply to Griffith but, you were going t=
o communicate this with them.  I am still getting calls from Robert and I'm=
 not sure how to handle his request at this point. =20

Please do not confuse this issue with the Batching valve that is currently =
out of service.  Also, do not confuse with Choquettes request to provide pr=
essure over-ride at this point as that can be done to provide steady state =
pressure with a flow control over-ride without reducing supply pressure dra=
matically to this interconnect point.  (However, there is the concern that =
if we install pressure control with a flow control over-ride that we put ou=
rselves in the position of reducing this supply pressure over time and then=
 getting into competing issues with El Paso. =20

I do not care how we configure this point.  However, again it could have im=
plications for marketing and gas control so, I prefer that you all make tha=
t call.