Message-ID: <29713054.1075852906136.JavaMail.evans@thyme> Date: Wed, 12 Sep 2001 08:42:00 -0700 (PDT) From: mansoor.abdmoulaie@enron.com To: kimberly.watson@enron.com Subject: TW-Blanco Hub and Questar interconnect 80-120 mmcf/d Mime-Version: 1.0 Content-Type: text/plain; charset=ANSI_X3.4-1968 Content-Transfer-Encoding: 7bit X-From: Abdmoulaie, Mansoor X-To: Watson, Kimberly X-cc: X-bcc: X-Folder: \KWATSON (Non-Privileged)\Watson, Kimberly\Inbox X-Origin: Watson-K X-FileName: KWATSON (Non-Privileged).pst Kim The level "A" (30% ?) to construct a new interconnect between TW and Questar at suction side of San Juan are as follows: Facility requirements: Tap/ Side-valve ( $75,000) 12" Ultra-Sonic meter Flow control-valve with positive shut-in Install fence-site Meter Building Chromatograph EFM& SCADA Costs: Material costs: $240,000 Contact, inspection $135,000 Eng and project management Contingency $50,000 OH and AFUDC $20,000 Total $520,000 If you have any questions please call. Mansoor