Message-ID: <22315484.1075852892967.JavaMail.evans@thyme>
Date: Tue, 7 Aug 2001 15:35:11 -0700 (PDT)
From: kimberly.watson@enron.com
To: jerry.graves@enron.com
Subject: RE: Outage Coordination Commercial Review
Mime-Version: 1.0
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: quoted-printable
X-From: Watson, Kimberly </O=ENRON/OU=NA/CN=RECIPIENTS/CN=KWATSON>
X-To: Graves, Jerry </O=ENRON/OU=NA/CN=RECIPIENTS/CN=Jgraves>
X-cc: 
X-bcc: 
X-Folder: \KWATSON (Non-Privileged)\Watson, Kimberly\Sent Items
X-Origin: Watson-K
X-FileName: KWATSON (Non-Privileged).pst

Jerry,

Unfortunately, our marketing department is off campus tomorrow with are Fac=
ility Planning group and will be unable to attend.  We will catch you next =
month.=20

Thanks, Kim.=20

 -----Original Message-----
From: =09Graves, Jerry =20
Sent:=09Tuesday, August 07, 2001 3:43 PM
To:=09Alexander, James C.; Bellard, Dannis; Blair, Lynn; Bonnstetter, Mike;=
 Boothe, David; Boston, Jerry; Brown, Sharon; Bryant, Mike; Buchanan, John;=
 Burns, Christopher; Clark, Scott; Cordes, Bill; Corless, Gary; Corman, She=
lley; Geaccone, Tracy; Gilbert, Tom; Good, Chuck; Gottsponer, Morgan; Graha=
m, Charlie; Graves, Jerry; Harris, Steven; Hood, Colleen; Howard, Randy; Ho=
well, Dennis; January, Steven; Jolly, Rich; Jordan, Fred; Keller, John R.; =
Kowalke, Terry; Kudym, Judy; Kuehl, Toby; Lawrence, James; LeBeau, Randy; L=
owry, Phil; Maestas, Gary; Mall, Greg; McGillivray, RR; Mertz, Tom; Moore, =
Jan; Morse, Ronnie; Nelson, Michel; Odneal, Dave; Pribble, Dan; Rice, Randy=
; Roensch, David; Schoolcraft, Darrell; Schroeder, Jim; Smith, Rick; Spragg=
ins, Gary; Stephens, LD; Swett, Larry; Sztroin, David; Teal, Mike; Thomas, =
Steve; Thompson, Charlie; Watson, Kimberly; Weatherford, Allan; Williams, J=
o; Williams, Walt; Abdmoulaie, Mansoor; Alters, Dennis; Dushinske, Adam; Fa=
ucheaux, Eric; Frazier, Perry; Gilbert, Maurice; Hughes, Matt; Matthews, Ro=
nald; Ramsaran, Gale; Smith, Buzz; Anderson, Ken; Aschwege, Doug; Beck, Jud=
y; Descoteaux, Carolyn; Dobbins, Dan; Johnson, Robert L.; Kolarik, David; R=
einecke, Bryan; Sans Souci, Becki; Westfall, Roger; Asante, Ben; Choquette,=
 Gary; Kouri, Kim; McChane, Bob; Sturn, John; Wirasinghe, Errol
Subject:=09Outage Coordination Commercial Review



FYI,

 8/08/01, is the next Outage Coordination Commercial Review meeting.  There=
 will be a few changes to the monthly meeting. First, you will see the name=
 has changed. The change was made to help maintain our focus of the meeting=
. Which is review the outages where flows are affected and discuss their im=
pact with the Commercial groups. The meeting will focus mainly on outages t=
hat have some throughput loss. If you have any questions or concerns please=
 give me a call. =20

Thank you

Jerry Graves=20
713-345-8923
                                                                           =
            << File: 080701CR.xls >>=20

When: August 8
Time: 1:00 to 2:00
Where: Houston 49C2
             Omaha  VCR - 7th floor
             Field Personnel - Conference # 877-795-3687 =20
                                         Code # 755555


Northern Border Pipeline
 Location=09Date  =09Scope =09Comments=09
=09=09=09=09
CS05=0908/16/01 to 08/16/01=09MP2, Scope, GG swap, and replace wire from ma=
in breaker to auxiliary.  (14 hrs.)=09(Potential impact is low)=09
CS13=0908/09/01 to 08/09/01=09Bore scope inspection, wash, MP2, and install=
 M/L Block Valve mods. (8hrs.)=09(Potential impact is low)=09
CS06=0908/21/01 to 08/21/01=09Borescope inspection, wash, MP2, and replace =
engine starter with modified starter. (10 hrs.)=09(Potential impact is low)=
=09
CS11=0908/28/01 to 08/28/01=09Scope, Wash, MP2 /L Block Valve addition, (10=
 hrs)=09(Potential impact is low)=09
CS02=0909/05/01 to 09/05/01=09Scope, Wash, MP2  (10 hrs)=09(Potential impac=
t is low)=09
CS04=0909/11/01 to 09/11/01=09Scope, MP2, Emissions testing. (10 hrs)=09(Po=
tential impact is low)=09
CS07=0909/18/01 to 09/18/01=09Scope, Wash, MP2, and replace Argotech pump. =
(10 hrs)=09(Potential impact is low)=09
CS09=0909/25/01 to 09/25/01=09Scope, MP2, Clean oil coolers. (10 hrs)=09(Po=
tential impact is low)=09