Message-ID: <28292537.1075852893148.JavaMail.evans@thyme> Date: Thu, 9 Aug 2001 07:46:59 -0700 (PDT) From: kimberly.watson@enron.com To: jerry.graves@enron.com Subject: RE: Outage Coordination Commercial Review Mime-Version: 1.0 Content-Type: text/plain; charset=ANSI_X3.4-1968 Content-Transfer-Encoding: quoted-printable X-From: Watson, Kimberly X-To: Graves, Jerry X-cc: X-bcc: X-Folder: \KWATSON (Non-Privileged)\Watson, Kimberly\Sent Items X-Origin: Watson-K X-FileName: KWATSON (Non-Privileged).pst Thanks for the future dates. I'll try not to schedule any more conflicts w= ith this time...... :>). Kim. -----Original Message----- From: =09Graves, Jerry =20 Sent:=09Wednesday, August 08, 2001 7:06 AM To:=09Watson, Kimberly Subject:=09RE: Outage Coordination Commercial Review Ouch!! =20 Thanks for letting me know Kim. Here are the planned dates for the Commerci= al Review for the rest of the year. Keep in mind that the dates can be chan= ged. The time and the place are the same. I would have to say, that I am cr= ushed. Picking those Planning guys over the Outage CoordinatorJ Their not c= ool? See you next time Jerry Sept. 12th Oct. 11th Nov. 14th Dec. 11th -----Original Message----- From: =09Watson, Kimberly =20 Sent:=09Tuesday, August 07, 2001 5:35 PM To:=09Graves, Jerry Subject:=09RE: Outage Coordination Commercial Review Jerry, Unfortunately, our marketing department is off campus tomorrow with are Fac= ility Planning group and will be unable to attend. We will catch you next = month.=20 Thanks, Kim.=20 -----Original Message----- From: =09Graves, Jerry =20 Sent:=09Tuesday, August 07, 2001 3:43 PM To:=09Alexander, James C.; Bellard, Dannis; Blair, Lynn; Bonnstetter, Mike;= Boothe, David; Boston, Jerry; Brown, Sharon; Bryant, Mike; Buchanan, John;= Burns, Christopher; Clark, Scott; Cordes, Bill; Corless, Gary; Corman, She= lley; Geaccone, Tracy; Gilbert, Tom; Good, Chuck; Gottsponer, Morgan; Graha= m, Charlie; Graves, Jerry; Harris, Steven; Hood, Colleen; Howard, Randy; Ho= well, Dennis; January, Steven; Jolly, Rich; Jordan, Fred; Keller, John R.; = Kowalke, Terry; Kudym, Judy; Kuehl, Toby; Lawrence, James; LeBeau, Randy; L= owry, Phil; Maestas, Gary; Mall, Greg; McGillivray, RR; Mertz, Tom; Moore, = Jan; Morse, Ronnie; Nelson, Michel; Odneal, Dave; Pribble, Dan; Rice, Randy= ; Roensch, David; Schoolcraft, Darrell; Schroeder, Jim; Smith, Rick; Spragg= ins, Gary; Stephens, LD; Swett, Larry; Sztroin, David; Teal, Mike; Thomas, = Steve; Thompson, Charlie; Watson, Kimberly; Weatherford, Allan; Williams, J= o; Williams, Walt; Abdmoulaie, Mansoor; Alters, Dennis; Dushinske, Adam; Fa= ucheaux, Eric; Frazier, Perry; Gilbert, Maurice; Hughes, Matt; Matthews, Ro= nald; Ramsaran, Gale; Smith, Buzz; Anderson, Ken; Aschwege, Doug; Beck, Jud= y; Descoteaux, Carolyn; Dobbins, Dan; Johnson, Robert L.; Kolarik, David; R= einecke, Bryan; Sans Souci, Becki; Westfall, Roger; Asante, Ben; Choquette,= Gary; Kouri, Kim; McChane, Bob; Sturn, John; Wirasinghe, Errol Subject:=09Outage Coordination Commercial Review FYI, 8/08/01, is the next Outage Coordination Commercial Review meeting. There= will be a few changes to the monthly meeting. First, you will see the name= has changed. The change was made to help maintain our focus of the meeting= . Which is review the outages where flows are affected and discuss their im= pact with the Commercial groups. The meeting will focus mainly on outages t= hat have some throughput loss. If you have any questions or concerns please= give me a call. =20 Thank you Jerry Graves=20 713-345-8923 = << File: 080701CR.xls >>=20 When: August 8 Time: 1:00 to 2:00 Where: Houston 49C2 Omaha VCR - 7th floor Field Personnel - Conference # 877-795-3687 =20 Code # 755555 Northern Border Pipeline Location=09Date =09Scope =09Comments=09 =09=09=09=09 CS05=0908/16/01 to 08/16/01=09MP2, Scope, GG swap, and replace wire from ma= in breaker to auxiliary. (14 hrs.)=09(Potential impact is low)=09 CS13=0908/09/01 to 08/09/01=09Bore scope inspection, wash, MP2, and install= M/L Block Valve mods. (8hrs.)=09(Potential impact is low)=09 CS06=0908/21/01 to 08/21/01=09Borescope inspection, wash, MP2, and replace = engine starter with modified starter. (10 hrs.)=09(Potential impact is low)= =09 CS11=0908/28/01 to 08/28/01=09Scope, Wash, MP2 /L Block Valve addition, (10= hrs)=09(Potential impact is low)=09 CS02=0909/05/01 to 09/05/01=09Scope, Wash, MP2 (10 hrs)=09(Potential impac= t is low)=09 CS04=0909/11/01 to 09/11/01=09Scope, MP2, Emissions testing. (10 hrs)=09(Po= tential impact is low)=09 CS07=0909/18/01 to 09/18/01=09Scope, Wash, MP2, and replace Argotech pump. = (10 hrs)=09(Potential impact is low)=09 CS09=0909/25/01 to 09/25/01=09Scope, MP2, Clean oil coolers. (10 hrs)=09(Po= tential impact is low)=09