Subject: Weekend Outage Report for 6-8-01 through 6-11-01
Mime-Version: 1.0
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit
X-From: Enron Announcements
X-To: Houston Outage Report
X-cc: 
X-bcc: 
X-Folder: \Lawrence_Whalley_Jun2001\Notes Folders\Notes inbox
X-Origin: Whalley-L
X-FileName: gwhalley.nsf

------------------------------------------------------------------------------
------------------------
W E E K E N D   S Y S T E M S   A V A I L A B I L I T Y

F O R

June 8, 2001 5:00pm through June 11, 2001 12:00am
------------------------------------------------------------------------------
------------------------


ECS to ECN Network Interconnection, June 9th 2001         POSTPONED
This is a notification that the Enron Corp. I/T Networks team will be 
connecting the new building network infrastructure located in Enron Center 
South (ECS) to the existing Enron Center North (ECN) backbone network.  While 
this activity is not expected to produce a disruption to network services, 
this notice is designed to alert the organization to our activities.  No 
network hardware or systems are anticipated to be shutdown.  The actual 
physical interconnection of the networks will be performed in the EB 34th 
floor Data Center.

Interconnection activities are scheduled to occur the evening of June 9th 
2001 starting from 7:00 p.m.(CT) and completing around 11:00 p.m. (CT). 
Application testing activities will begin at 11:00 p.m. (CT) once all network 
testing has completed.

If you have any further questions, please contact Pete Castrejana at 
713-410-0642 for more information.
      

SCHEDULED SYSTEM OUTAGES: 

ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.

AZURIX: No Scheduled Outages.

EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.

EDI SERVER: No Scheduled Outages.

ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages

ENRON NORTH AMERICAN LANS:  No Scheduled Outages.

FIELD SERVICES:  No Scheduled Outages.

INTERNET: No Scheduled Outages.

MESSAGING: No Scheduled Outages.

MARKET DATA: No Scheduled Outages.

NT: No Scheduled Outages.

OS/2:  No Scheduled Outages.

OTHER SYSTEMS: 
Impact:  pdx-ad-03.ebs.enron.net [DS] Site: Portland
Time:  Sat 6/9/2001 at  9:00:00 PM CT thru Sat 6/9/2001 at  9:15:00 PM CT
 Sat 6/9/2001 at  7:00:00 PM PT thru Sat 6/9/2001 at  7:15:00 PM PT
 Sun 6/10/2001 at  3:00:00 AM London thru Sun 6/10/2001 at  3:15:00 PM London
Outage:  Increase EBS domain account password complexity
Environments Impacted:  EBS (enron_comm) users
Purpose: Increasing password complexity reduces the security risk for the 
CORP domain and corp security based applications.
Backout: Deinstall the password filter.
Contact(s):  Marlin Gubser    713-853-4281
      
Impact:  CORP
Time:  Sat 6/9/2001 at  10:00:00 PM CT thru Sun 6/10/2001 at    1:00:00 AM CT
 Sat 6/9/2001 at    8:00:00 PM PT  thru Sat 6/9/2001 at  11:00:00 PM PT
 Sun 6/10/2001 at  4:00:00 AM London thru Sun 6/10/2001 at  7:00:00 AM London
Outage:  Memory upgrade and storage relocation for server fracture.
Environments Impacted:  RMS global company OFS
Purpose: Add memory for performance improvement.  Permanently rack D1000 disk 
array.
Backout: Restore to original configuration without memory.
Contact(s):  Malcolm Wells    713-345-3716
 
SITARA:  No Scheduled Outages.

SUN/OSS SYSTEM: No Scheduled Outages.

TELEPHONY: 
Impact:  CORP
Time:  Fri 6/8/2001 at  5:00:00 PM Calgary thru Sun 6/10/2001 at  12:00:00 PM 
Calgary
 Fri 6/8/2001 at  6:00:00 PM CT thru Sun 6/10/2001 at    1:00:00 PM CT
 Fri 6/8/2001 at  4:00:00 PM PT thru Sun 6/10/2001 at  11:00:00 AM PT
 Sat 6/9/2001 at  12:00:00 AM London thru Sun 6/10/2001 at  7:00:00 PM London
Outage:  Enron Canada-Calgary PBX Upgrade
Environments Impacted:  Corp Calgary
Purpose: To bring Enron Calgary up to Enron standards.  Allow 4 digit dialing 
between Enron Canada Corp. and Enron Direct Limited Partnership, and network 
the voicemail. Enron Calgary will be without phone service for the duration 
of the upgrade.
Backout: As a complete new cabinet "A" will be installed we will have the old 
cabinet with processor on site that can be reinstalled in the event that 
problems arise. 
Contact(s):  Brad K Martin  (403) 974-6922  (403) 212-9280
 
TERMINAL SERVER:  No Scheduled Outages.

UNIFY:  
Impact:  CORP
Time:  Fri 6/8/2001 at    2:00:00 PM CT thru Mon 6/11/2001 at    2:00:00 AM CT
 Fri 6/8/2001 at  12:00:00 PM PT thru Mon 6/11/2001 at  12:00:00 AM PT
 Fri 6/8/2001 at 8:00:00 PM London thru Mon 6/11/2001 at  8:00:00 AM London
Outage:  Unify Gas Migration from Sybase to SQL Server
Environments Impacted:  Unify Users
Purpose: Increase reliability and scalability of Unify system
Backout: Reinstate Sybase version if insurmountable problems occur during the 
conversion weekend.
Contact(s):  Brian Ripley    713-345-4709
  Matt Pena        713-345-4209
  Ramesh Rao   713-349-4207 
  Bob Ward        713-345-4409
 
------------------------------------------------------------------------------
-------------------------------------------------------
        FOR ASSISTANCE

(713) 853-1411   Enron Resolution Center


Specific Help:
Information Risk Management   (713) 853-5536
SAP/ISC                                                                       
        (713) 345-4727
Unify On-Call      (713) 284-3757  [Pager]
Sitara On-Call     (713) 288-0101  [Pager]
RUS/GOPS/GeoTools/APRS   (713) 639-9726  [Pager]
OSS/UA4/TARP    (713) 285-3165  [Pager]
CPR      (713) 284-4175  [Pager]
EDI Support      (713) 327-3893  [Pager]
EES Help Desk     (713)853-9797 OR (888)853-9797
TDS -Trader Decision Support On-Call                    (713) 327-6032 [Pager]