Message-ID: <20059286.1075851672314.JavaMail.evans@thyme> Date: Wed, 27 Dec 2000 08:53:00 -0800 (PST) From: david.fisher@enron.com To: andy.zipper@enron.com, bob.shults@enron.com, jay.webb@enron.com, michael.guadarrama@enron.com, bob.hillier@enron.com, kevin.montagne@enron.com, anchi.zhang@enron.com, sheri.thomas@enron.com, jennifer.denny@enron.com, dale.neuner@enron.com, robert.cass@enron.com, torrey.moorer@enron.com Subject: Exchange Linking Status Update Mime-Version: 1.0 Content-Type: text/plain; charset=us-ascii Content-Transfer-Encoding: 7bit X-From: David Fisher X-To: Andy Zipper, Bob Shults, Jay Webb, Michael Guadarrama, Bob Hillier, Kevin Montagne, Anchi Zhang, Sheri Thomas, Jennifer deBoisblanc Denny, Dale Neuner, Robert B Cass, Torrey Moorer X-cc: X-bcc: X-Folder: \Andrew_Zipper_Nov2001\Notes Folders\All documents X-Origin: ZIPPER-A X-FileName: azipper.nsf All, In my haste to begin the four day weekend last week, I failed to send the status update I promised in my earlier note. Below is a slightly tardy but nonetheless riveting Exchange Linking Status Update. 1. Exchange Linking Software Development - Functional development was completed on schedule and we are currently performing testing of the Beta release. Initial testing has gone very well. A final release is scheduled for January 15th. I will be working with Victoria Storey from the Operations group in turning over external testing of the system. A deployment plan has been submitted to Operations to assist them with the rollout. 2. Exchange Linking GUI - Development is complete and testing is being conducted. 3. Product Mapping - Product Control Group continues their effort of coordinating with TrueQuote the products covered under Schedule A of the contract. Points of contact have been arranged between Enron (Rob Cass) and TrueQuote (Richard Toubia) to continue the coordination effort required to support ongoing product mapping. 4. Hardware - All network and server hardware has been received and installed. 5. Leased Lines - Anchi Z. has been coordinating with each exchange's network POC and assisting in obtaining T-1 lines to support this project. In the absence of T-1 lines, both TrueQuote and Houston Street will be using VPN connectivity to conduct testing. We should be up and running with TrueQuote by 28 December so that testing can begin. Houston Street does not anticipate being ready to test anything until the end of February. 6. Bridging - Downstream system bridging modifications have been made to accommodate the addition of an external exchange id and an external exchange deal number. 7. TrueQuote has stated that they will not make the contract date with regard to some of the functionality of their system. They hope to be able to fully act as a client exchange but are not prepared to take on the role of an external exchange (i.e. handle transaction attempts from Enron.) 8. Houston Street is back in the picture. Their stated contract date is December 4th + 120 calendar days. This gives them some breathing room. They have canned Sapient, built their own internal IT team, purchased messaging software from Web Methods and changed hosting providers. They will no longer use Genuity out of Boston but Data Return out of Dallas for their hosting needs. Please advise if you have any questions or comments. -David