Subject: Weekend Outage Report for 5-25-01 through 5-29-01
Mime-Version: 1.0
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit
X-From: Enron Change Management Announcement@ENRON <IMCEANOTES-Enron+20Change+20Management+20Announcement+40ENRON@ENRON.com>
X-To: Houston Outage Report@ENRON <??SHouston Outage Report@ENRON>
X-cc: 
X-bcc: 
X-Folder: \Zipper, Andy\Zipper, Andy\Deleted Items
X-Origin: ZIPPER-A
X-FileName: Zipper, Andy.pst



------------------------------------------------------------------------------------------------------
W E E K E N D   S Y S T E M S   A V A I L A B I L I T Y

F O R

May 25, 2001 5:00pm through May 29, 2001 12:00am
------------------------------------------------------------------------------------------------------

ECS to ECN Network Interconnection, June 9th 2001

This is a notification that the Enron Corp. I/T Networks team will be connecting the new building network infrastructure located in Enron Center South (ECS) to the existing Enron Center North (ECN) backbone network.  While this activity is not expected to produce a disruption to network services, this notice is designed to alert the organization to our activities.  No network hardware or systems are anticipated to be shutdown.  The actual physical interconnection of the networks will be performed in the EB 34th floor Data Center.

Interconnection activities are scheduled to occur the evening of June 9th 2001 starting from 7:00 p.m.(CT) and completing around 11:00 p.m. (CT). Application testing activities will begin at 11:00 p.m. (CT) once all network testing has completed.

If you have any further questions, please contact Pete Castrejana at 713-410-0642 for more information.



SCHEDULED SYSTEM OUTAGES: 

ARDMORE DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.

AZURIX: No Scheduled Outages.

EB34 DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages.

EDI SERVER: No Scheduled Outages.

ENRON CENTER SOUTH DATA CENTER - FACILITY OPERATIONS: No Scheduled Outages

ENRON NORTH AMERICAN LANS:  
Impact:  EB28
Time:  Sat 5/26/2001 at  10:00:00 AM CT thru Sat 5/26/2001 at  11:15:00 AM CT
	Sat 5/26/2001 at    8:00:00 AM PT thru Sat 5/26/2001 at   9:15:00 AM PT
	Sat 5/26/2001 at  4:00:00 PM London thru Sat 5/26/2001 at  5:15:00 PM London
Outage:  EB28 Intermitted Network Outage
Environments Impacted:  EB28
Purpose: New construction in the tele-communication closet
Backout: 
Contact(s): 	Mark Trevino    713-345-9954
 
FIELD SERVICES:  No Scheduled Outages.

INTERNET: No Scheduled Outages.

MESSAGING: 
Impact:  CORP
Time:  Sat 5/26/2001 at  6:30:00 PM CT thru Sat 5/26/2001 at  11:00:00 PM CT
	Sat 5/26/2001 at 4:30:00 PM PT thru Sat 5/26/2001 at    9:00:00 PM PT
	Sun 5/27/2001 at  12:30:00 AM London thru Sun 5/27/2001 at  5:00:00 AM London
Outage:  Norton Anti-virus Installation-Phase 2
Environments Impacted:  Corp Exchange users
Purpose: To protect the Exchange users and environment from email-based viruses.
Backout: Un-install Norton Anti-virus.
Contact(s): 	Tim Hudson  713.853.9289  
 
MARKET DATA: No Scheduled Outages.

NT: No Scheduled Outages.

OS/2:  No Scheduled Outages.

OTHER SYSTEMS: 
Impact:  Corp, OTS, ETS    
DATE:  MAY 29, 2001/2/2001 at  5:30:00 PM
Outage:  Migrate DSS Server to GTHOU-APPSQ03P
Environments Impacted:  DSS users will not be able to access the old server (ENEDS01_ADAPT)after this date
Purpose: The existing server is outdated, migrating to SQL 2000 provides increased 
functionality and conforms to database platform requirements.   
Backout: 
Contact(s): 	Mary Vollmer          713-853-3381
		Joe Hellsten           713-853-7346      713-545-4164
				
Impact:  Portland EBS
Time:  Fri 5/25/2001 at  8:00:00 PM CT thru Fri 5/25/2001 at  8:30:00 PM CT
	Fri 5/25/2001 at  6:00:00 PM PT thru Fri 5/25/2001 at  6:30:00 PM PT
	Sat 5/26/2001 at  2:00:00 AM London thru Sat 5/26/2001 at  2:30:00 AM London
Outage:  Decommission Transport Logic FW (Portland EBS)
Environments Impacted:  Portland EBA
Purpose: No longer used - 
Backout: Power equipment back on
Contact(s): 	Jon Werner    713-853-6742
 
SITARA:  No Scheduled Outages.

SUN/OSS SYSTEM: No Scheduled Outages.

TELEPHONY: No Scheduled Outages

TERMINAL SERVER:  No Scheduled Outages.

UNIFY:  No Scheduled Outages.

-----------------------------------------------------------------------------------------------------------------------------
								FOR ASSISTANCE

(713) 853-1411   Enron Resolution Center


Specific Help:
Information Risk Management			(713) 853-5536
SAP/ISC                                                                               (713) 345-4727
Unify On-Call 					(713) 284-3757  [Pager]
Sitara On-Call					(713) 288-0101  [Pager]
RUS/GOPS/GeoTools/APRS			(713) 639-9726  [Pager]
OSS/UA4/TARP				(713) 285-3165  [Pager]
CPR						(713) 284-4175  [Pager]
EDI Support 					(713) 327-3893  [Pager]
EES Help Desk					(713)853-9797 OR (888)853-9797