Message-ID: <33380538.1075851673908.JavaMail.evans@thyme>
Date: Thu, 7 Dec 2000 14:55:00 -0800 (PST)
From: bob.hillier@enron.com
To: andy.zipper@enron.com
Subject: FW: Tradespark Requirements
Mime-Version: 1.0
Content-Type: text/plain; charset=us-ascii
Content-Transfer-Encoding: 7bit
X-From: Bob Hillier
X-To: Andy Zipper
X-cc: 
X-bcc: 
X-Folder: \Andrew_Zipper_Nov2001\Notes Folders\Discussion threads
X-Origin: ZIPPER-A
X-FileName: azipper.nsf

Andy, do we have any intention of doing any integration with Tradespark at 
this time?  If we do I will get more involved in this otherwise we will just 
let the infrastructure team continue to run with this.

Let me know,
bbh

 -----Original Message-----
From:  Bob McAuliffe  
Sent: Tuesday, December 05, 2000 1:50 PM
To: Bob Hillier
Subject: FW: Tradespark Requirements

I need to have another discussion about this with you . . . we need an 
application group to work on this, because there is quite a bit of 
application analysis that needs to be done.

I found out that from an infrastructure perspective, this is much more than 
just a remote connection.  It involves an application implemented in our 
environment, and applications deployed to the desktop.  Is this something the 
e-commerce team needs to be involved in (I don't think it is), but probably 
more like Beth Perlman's team.

Bob.

 -----Original Message-----
From:  "Matricciano, Marcello" <MMatricciano@espeed.com>@ENRON 
[mailto:IMCEANOTES-+22Matricciano+2C+20Marcello+22+20+3CMMatricciano+40espeed+
2Ecom+3E+40ENRON@ENRON.com] 
Sent: Wednesday, November 29, 2000 11:12 AM
To: McAuliffe, Bob
Subject: FW: Tradespark Requirements

Correction to previous e-mail:
 The equipment we would send to Enron would comprise of 2 Cisco 2600
Routers (1 for each circuit), 2 Cisco Hubs, 2 Sun Ultra 5s with 2 NIC cards
each. Each Sun would connect to its own hub and router for redundancy and
load balancing purposes.
Sorry for the confusion.

Marcello

> -----Original Message-----
> From: Matricciano, Marcello
> Sent: Wednesday, November 29, 2000 11:49 AM
> To: 'Bob McAuliffe'
> Subject: Tradespark Requirements
>
> Bob,
>  At this present time TradeSpark intends on order 2 diverse 128K
> dedicated digital Fractional T-1 circuits (1 from Westcomm, 1 from Cable &
> Wireless). These circuits would terminate at a specific location within
> your Comms Room. From there we would request to have the circuits extended
> as to where our equipment would live. The standard equipment used in a
> TradeSpark installation are as follows: 1) one Cisco 2600 Router, 2) one
> Cisco 16 port Manageable Hub, 3) one Sun Ultra 5 with 2 interfaces: one
> for us, one for your network. The Sun Ultra 5 does not come with a monitor
> so the space requirements for this installation are minimal. The 2
> circuits would connect directly into the WIC cards on the router. No
> modems are required.
>  Once the equipment is installed and tested we can begin the process
> of connecting from your network. All we need from Enron is a network IP
> address to configure onto the 2nd interface on the Sun box. All
> interfacing is done via this interface. If there is a firewall between our
> box and your network, our application requires TCP/IP bi-directional
> ports 8000 and 9000 to be opened. Please feel free to call me @ (212)
> 938-4726 if you have any further questions and/or issues.
>
>
> Marcello Matricciano